Quantum Construction Consultants, LLC

subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link
subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link
subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link
subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link
subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link
subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link
subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link
subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link

Flood Mitigation / Bridge Project

Twin Bridge
over Baboosic Brook
Merrimack, New Hampshire

 

 

 

 

 

 

 


 

 

 

The Twin Bridges are bridges that span two branches of the Baboosic Brook to provide pedestrian access across an island in Twin Bridge Park. The bridge spanning the southerly branch of the Baboosic Brook is a single concrete arch, while the bridge spanning the northerly branch consisted of two arches. During the May 2006 flood, the north span was heavily damaged. The north abutment of the bridge was severely undermined and the bridge dropped, leaving no reasonable options for repair. This project was the recipient of FEMA Public Assistance funding.

The Town of Merrimack contracted with QCC to design a replacement structure. The new structure is a prefabricated steel truss pedestrian bridge that spans approximately 70 feet over the brook to the island. The new bridge structure is founded on new tall concrete abutments located on the banks, to provide greater waterway clearance and hydraulic capacity.

Contact:

David Lent, Deputy Director of Public Works
Town of Merrimack
12 Bishop Street
P.O. Box 940
Merrimack, NH 03054
(603) 424-5137