Quantum Construction Consultants, LLC

subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link
subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link
subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link
subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link
subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link
subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link
subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link
subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link

Bridge Replacement Project

North Main Street
over Miller Brook
Antrim, New Hampshire

 

 

 

 

 

 

 


 

 

During the period of May 12 to May 23, 2006, heavy rains in the Antrim area caused unusually high flow through the North Main Street Arch culvert. The structure and stone masonry wingwalls were subjected to a high level of water and extreme flow velocity.

QCC performed a damage assessment and confirmed that the foundations had lost material beneath the arch due to stream scour. Soil loss through the stone masonry abutments occurred from receding water following the submerged condition. A large sinkhole formed in the roadway fill behind the south abutment and southeast masonry wingwall. A sewer and water line are on the bridge and at risk during flood events.

QCC performed a hydraulic study and found that this waterway has the potential to serve as a flood relief to the downtown area. QCC evaluated mitigation alternatives and recommended replacement with a new concrete box structure with the utilities protected in the roadway fill above the structure. Future modifications to two upstream structures will allow flood relief to numerous structures on the adjacent Great Brook, providing a large mitigation benefit to the Town.

Contact:

Neal Cass, Town Administration
Town of Antrim